ADS-3SWSHD05-NLXMF-FFFFFF
Women's Curved Basketball Shoes With Thick Soles
Women's Curved Basketball Shoes With Thick Soles
Women's Curved Basketball Shoes With Thick Soles
Women's Curved Basketball Shoes With Thick Soles

Women's Curved Basketball Shoes With Thick Soles

Regular price$209.00
/
Shipping calculated at checkout.

Color
Shoe size
  • Free shipping for the USA and CANADA
  • In stock, ready to ship
  • Inventory on the way

Complete with eyelets and a lace up closure for a classic look

  • The upper is made of leather and the sole is made of Rubber
  • Feature:Fashion Trend, Anti-Slippery, Hard-Wearing, Shock-Absorbant
  • Care Instruction: Spot clean only

Size Guide

 

EUR Size US Size Insole Lengthinch Insole Lengthmm
35 5 8.9 225
36 6 9.1 231
37 7 9.4 238
38 7.5 9.6 244
39 8 9.9 251
40 9 10.2 259
41 10 10.5 266
42 11 10.6 270
43 12 10.9 278

 

 

Free shipping in the USA and Canada

This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.

Impressive

We hand paint each color

Each color can be changed to the ones you desire. The colors do not fade nor wash out.

Art Infinitum story

The company was created in 2020 and is the result of an accumulation of experience with Art, engineering and a will to offer something different. Art Infinitum was in New York Fashion Week 2022 where it created and presented for the first time the "Rope Jacket in denim" and is featured in the movie "We are here", a thriller coming to you on Netflix and the theaters in August 2025.

It's Mascot is Bart. The bear (PS: Cute but he can have a temper...)

Testimonials

★★★★★

Suzdariffe David  recommends Art Infinitum.

January 8, 2023·Their art patterns always catches people's eye! The quality of the clothes are longlasting and strong, not like those cheap fast fashion companies. I like the velour with their loungewear and the leather with their purses. I'm always getting compliments when I wear Art Infinitum.

Suzy
Los Angeles, CA
★★★★★

Cassandra Fiona Houck

January 6, 2023·I love the texture of the fabric it feels so luxurious and the colors are so vibrant. I loved rocking these bikinis at Miss Bikini US. I received so many compliments from photographers, models, and the audience. These are definitely my go to bikini

Cassandra
Seattle, WA
★★★★★

Mireille

December 19, 2022·J ai commande plusieurs Hoodies, une paire de Poodies et 2 sacs à main... Je dois me contrôler lol. Adorable et vraiment d une qualité superbe. J adore!

Mireille
Figeac, France

Recently viewed